Skip to page body Home About Us Schools Departments Board of Education Parents
 

2005 Bond - High School - North Features

Series 1

  • Design & Plan for Construction Projects
  • Add Music and Choir Classrooms
  • Add Emergency Generator and Electrical Upgrade for Safety & Security
  • Add Technology Infrastructure and Equipment for Curriculum Support
  • Install Fire Protection System for Safety
  • Upgrade Mechanical Controls
  • Install Synthetic Turf on Field Facilities (Football Field)
  • Replace Classroom Furniture as Required
  • Replace Building Fire Alarm System for Safety
  • Replace Stadium Bleachers and Press Box
  • Improve Site Lighting for Security and Safety
  • Remodel Restrooms as Required
  • Art and Music Equipment, Media Books
  • Upgrade Security Systems

Series 2

  • Repave Parking Lot as Required
  • Add Electronic Message Sign for Improved Communication
  • Add Commons Area
  • Upgrade Plumbing System
  • Replace Mechanical Roof Top HVAC Units
  • Improve Existing Athletic Fields and Facilities
  • Add Technology Infrastructure and Equipment for Curriculum Support
  • Add Exterior Storage
  • Remodel Art Rooms
  • Add Technology Infrastructure & Equipment for Curriculum Support
  • Art and Music Equipment, Media Books

Series 3

  • Add Classrooms to Meet Curriculum Needs
  • Expand Kitchen
  • Replace Classroom Lighting System
  • Expand parking Lot as Required
  • Repave parking Lots and Drives as Required
  • Replace Doors and Locks for Safety& Security
  • Install Corridor & Athletic Lockers
  • Install Site Lighting for Safety & Security
  • Add Technology Infrastructure and Equipment for Curriculum Support
  • Replace Windows as Required
  • Upgrade Exterior Storage Building
  • Remodel Classrooms to Meet Instructional Needs
  • Replace Site Fencing
  • Remodeled Auditorium and Stage Areas
  • Add Technology Infrastructure & Equipment for Curriculum Support
  • Art and Music Equipment, Media Books
Last updated: 4/24/2012 1:49:49 PM