Construction Updates
Summer 2006
The new artificial turf has been installed on the football field. The track has been resurfaced. The bleachers on the home side of the football field have been replaced, along with a new press box. Construction of a new ticket booth is nearing completion. Air conditioning units have been installed in the main and intermediate data-wiring closets (MDF and IDF rooms).
|