Project Update
The concrete floor in the new gymnasium was completed March 1. In preparation for the concrete, a sand base was graded and compacted. The base was covered by a vapor barrier layer and wire mesh for stability. Over two hundred yards of concrete was laid in one day. Soffit framing on the exterior continues. Roof sumps and overflows have been tied into the new walls. Block work continues on interior walls in the toilet rooms and corridor area. Masonry work on the Commons area continues. The metal roof deck and edge work will be set in place the first week of March. Door frames are being installed. If you have any questions, please call Sandy Denewith at (586) 783-6550 x 1121 and leave a message. Your call will be returned as soon as possible.
Summer / Fall Construction Projects
Improvements to underground drainage on site
Installation of artificial turf on football field
Resurfacing of track
Demolition of existing gymnasium
Construction of new three-court gymnasium and sports lobby
Construction of new main entrance
Construction of new student commons area and school store 
Pictures from 3-29-07



|